SMMG Clinical Diagnostic Laboratory Cleanroom— Case Study

Case Study · Philippines

SMMG Clinical Diagnostic Laboratory — Cleanroom Case Study

ICARELIFE delivered a complete cleanroom envelope solution for Sorsogon Medical Mission Group's new clinical diagnostic laboratory — praised by the Department of Health as a first-of-its-kind facility in the region.

Sorsogon City, Philippines
Delivered 2025 · TAC 2026
Clinical Laboratory
Read the Case Study
Project Overview

Delivering a turnkey cleanroom for a leading Philippine hospital network

Location
Sorsogon City, Philippines
Delivery
2025
TAC Completed
2026
Project Type
Clinical Diagnostic Lab
Partner
Delta Engineering
Incoterms
DDP Hospital
The Challenge

A growing hospital network needed a standard-setting laboratory

Sorsogon Medical Mission Group (SMMG) Hospital, part of the Medical Mission Group Federation of Hospitals & Health Services (MMG), is a faith-based healthcare network serving communities across the Bicol Region of the Philippines.

When SMMG planned a new Clinical Diagnostic Laboratory, the requirement was clear: the facility had to meet Department of Health (DOH) regulatory standards for clinical laboratory design, including cleanroom-grade wall and ceiling systems, sealed observation windows, medical-grade doors, ESD flooring, and controlled lighting.

The project required a turnkey supply chain — from manufacturing and custom panel cutting in Shenzhen to door-to-door delivery and on-site installation support in Sorsogon City, over 2,000 km from Manila. Materials were delivered in 2025; testing and commissioning (TAC) were completed in 2026, ahead of the hospital's grand opening.

SMMG Hospital building exterior in Sorsogon City, Philippines
The Solution

A complete cleanroom envelope system, delivered DDP

ICARELIFE supplied the full interior cleanroom envelope for the laboratory — modular wall panels, ceiling system, cleanroom steel doors, observation windows, stainless steel sinks, ESD PVC flooring, and IP54 LED luminaires. All materials were manufactured, custom-cut, and packaged in Shenzhen, then shipped door-to-door under DDP terms to the hospital site in Sorsogon.

  • Modular Cleanroom Wall Panels (Magnesium-Core)

    50 mm thick, 0.426 mm organic-coated steel base with magnesium core — A-grade non-combustible, high density, heat-resistant, and eco-friendly (no radiation, asbestos, or formaldehyde). Custom-cut to exact panel dimensions from the shop drawing.

  • High-Density Inorganic Cleanroom Ceiling System

    6 mm ceiling panels cut to 1200 × 600 mm modules with assembled aluminum ceiling grid — providing a seamless, cleanable surface resistant to humidity and microbial growth.

  • Cleanroom Steel Doors with Observation Windows

    18 sets of single- and double-leaf cleanroom steel doors (manual operation) in four opening sizes, each with 0.8 mm galvanized steel leaf, aluminum honeycomb core, 600 × 400 mm double-layer tempered glass observation window, and integrated stainless steel silent locks.

  • Double-Glazed Observation Windows & Pass-Through Windows

    50 mm thick double-glazed cleanroom observation windows and non-standard pass-through windows with 10 mm tempered glass — configured in 1, 2, and 4-opening layouts for specimen transfer and staff communication.

  • ESD PVC Flooring & IP54 Cleanroom LED Luminaires

    2 mm homogeneous ESD PVC flooring, paired with cleanroom LED panel luminaires (600 × 600 mm and 300 × 600 mm) rated IP54 for dust and moisture resistance.

  • Stainless Steel Hand-Washing Sinks (SS304)

    15 sets of floor-standing 304 SS sinks (1.2 mm thick, 600 × 800 mm) with faucets — positioned throughout the laboratory for decontamination and specimen handling areas.

Key Materials Supplied

Project bill of materials at a glance

# Material Key Specifications Qty
1 Modular Cleanroom Wall Panel — Magnesium-Core 50 mm thick · 0.426 mm organic-coated steel · magnesium core · A-grade non-combustible 275 m²
2 High-Density Inorganic Cleanroom Ceiling Panel 6 mm thick · cut to 1200 × 600 mm · high density, heat-resistant, eco-friendly 230 m²
3 Single-Leaf Cleanroom Steel Door (Manual) 900 / 1000 × 2200 mm · 40 mm leaf · 0.8 mm galvanized steel · aluminum honeycomb core · tempered glass window 14 sets
4 Double-Leaf Cleanroom Steel Door — Asymmetrical (Manual) 1100 × 2200 mm · same door specification as above 2 sets
5 Single-Leaf Cleanroom Steel Door — Narrow (Manual) 800 × 2200 mm · same door specification as above 2 sets
6 Stainless Steel Hand-Washing Sink (SS304) 304 SS · floor-standing · 1.2 mm thick · 600 × 800 mm · with faucet 15 sets
7 Double-Glazed Cleanroom Observation Window 50 mm thick · sizes: 2400×1000, 1200×1000, 1200×600 mm · insulated observation glass 4 sets
8 Cleanroom Pass-Through Window (Non-Standard) 1200 × 1200 mm · 50 mm thick · 10 mm tempered glass · 1/2/4-opening configurations 3 sets
9 ESD Homogeneous PVC Flooring 2 mm homogeneous ESD PVC · electrostatic-dissipative
10 IP54 Cleanroom LED Panel Luminaire 600 × 600 mm (48 W) & 300 × 600 mm (24 W) · 4560 lm · IP54

Incoterms: DDP Hospital · Shipping: Door-to-Door · Lead Time: 30 working days

Client Testimonial

"It looks like a world-class laboratory"

Dr. Alvin Cledera
Dr. Alvin Cledera
General Manager, SMMG Clinical Diagnostic Lab
💬

It's world class laboratory👍

1:49 PM

Even the engineer from Dept of Health who inspected it, said it was his first time to see that kind of laboratory

3:00 PM
Original chat screenshot from Dr. Alvin Cledera
Original message screenshot
Verified feedback from SMMG Hospital
Verified
Verified by SMMG General Manager

Real feedback. Real impact.

During final inspection, the Department of Health engineer told the SMMG team he had never seen a clinical diagnostic laboratory of this standard before. Dr. Alvin Cledera, General Manager of the SMMG Clinical Diagnostic Laboratory, shared the news directly.

Dr. Alvin Cledera
Dr. Alvin Cledera
General Manager
SMMG Clinical Diagnostic Laboratory
🏆

DOH Inspector Endorsement

The inspecting engineer from the Philippines Department of Health stated this was the first time he had encountered a clinical laboratory built to this level of finish and compliance.

"It's a world-class laboratory. Even the engineer from the Department of Health who inspected it said it was his first time to see that kind of laboratory… Next year SMMG will be building a new hospital. It's a 4-storey building that will include OR, ICU, Lab, etc. All the interior finishes will be awarded to us."

— Ervin Nebit, Founder, Delta Engineering (relaying feedback from SMMG Hospital leadership)

Ervin Nebit, Founder of Delta Engineering, inside the completed laboratory
Partnership

10 Years of Trust with Delta Engineering

Delta Engineering and Industrial Technology, based in San Pedro Laguna, Philippines, has been ICARELIFE's integration partner for a decade. Founder Ervin Nebit leads project execution on the ground — from site measurement and shop drawing coordination to installation supervision and client liaison.

This long-standing partnership ensures that ICARELIFE's cleanroom systems are installed to specification, on schedule, and with local technical support throughout the Philippines.

10+
Years Partnership
DDP
Door-to-Door Delivery
30
Days Lead Time
What's Next

SMMG New 4-Storey Hospital — OR, ICU, Lab & More

Following the success of the clinical diagnostic laboratory, SMMG is planning a new 4-storey hospital building that will include operating rooms (OR), ICU, and additional laboratory space. Delta Engineering has confirmed that all interior finishes for the new facility will be awarded under the same partnership — opening the next phase of collaboration with ICARELIFE.

Frequently Asked Questions

Common questions about this cleanroom laboratory project

ICARELIFE's cleanroom envelope system for clinical diagnostic laboratories includes magnesium-core wall panels, high-density inorganic ceiling panels, cleanroom steel doors with observation windows, double-glazed and pass-through windows, ESD PVC flooring, IP54 cleanroom LED luminaires, and stainless steel sinks — supplied as one coordinated scope.

DOH-licensed clinical laboratories in the Philippines must meet infection-control and structural requirements covering wall and ceiling materials, door and window sealing, flooring, and lighting. ICARELIFE's cleanroom wall panels, sealed observation windows, and ESD flooring are specified to support these compliance requirements.

Delta Engineering and Industrial Technology, based in San Pedro Laguna, handled site measurement, shop drawing coordination, and installation supervision for the SMMG project. Delta Engineering has been ICARELIFE's integration partner in the Philippines for over a decade.

For the SMMG project, ICARELIFE delivered materials under DDP (Delivered Duty Paid) terms with door-to-door shipping and a lead time of 30 working days from Shenzhen to the hospital site in Sorsogon, Philippines.

Planning a Cleanroom or Laboratory Project?

Talk to our team about turnkey cleanroom envelope solutions — from custom panel manufacturing to DDP delivery and on-site support.

Contact ICARELIFE

Newsletter

Subscribe to our Newsletter & Event right now to be updated.

Contact Us

ICARELIFE , Your reliable partner in MOT equipment and supplies.

Ceiling Laminar Airflow

Contact US

ICARELIFE are committed to offering  a wide range of  product for OR builder

Corian Medical Scrub Sink
ICARELIFE, Solution for OR Builder
You reliable solution on modular operating room equipment and supplies.

Contac Us

Contac us

Operating Room Hermetic Door